可可英语 | 听写训练 | 情景会话 | 擂台赛 | 每日英语 | 口语秀 | 写作 | 可可地盘 | 可可论坛 | 意见建议 | 登录

词典 | 翻译 | 生词本 | 背单词 | 可可首页

参考例句

    1. Characteristic water level and reservoir capacity is fixed, freeboard and dam crest is calculated, seepage prevention of dam body, dam foundation and dam sheeting is discussed.
    针对除险加固措施,确定了水库特征水位与库容,计算了坝顶超高及坝顶高程,探讨了坝体和坝基防渗、坝面护坡及防冻等问题。
    2. CSG dam is a kind of new dam type that between traditional earth-rockfill dam and concrete gravity dam.
    CSG坝是一种介于传统土石坝和重力坝之间的新坝型,它兼备两种坝型的优点,并且具有一些自身独特的优势。
    3. Characteristic water level and reservoir capacity is fixed, freeboard and dam crest is calculated, seepage prevention of dam body, dam foundation and dam sheeting is discussed.
    针对除险加固措施,确定了水库特征水位与库容,计算了坝顶超高及坝顶高程,探讨了坝体和坝基防渗、坝面护坡及防冻等问题。
    4. Characteristic water level and reservoir capacity is fixed, freeboard and dam crest is calculated, seepage prevention of dam body, dam foundation and dam sheeting is discussed.
    针对除险加固措施,确定了水库特征水位与库容,计算了坝顶超高及坝顶高程,探讨了坝体和坝基防渗、坝面护坡及防冻等问题。
    5. CSG dam is a kind of new dam type that between traditional earth-rockfill dam and concrete gravity dam.
    CSG坝是一种介于传统土石坝和重力坝之间的新坝型,它兼备两种坝型的优点,并且具有一些自身独特的优势。

网络释义

    Study on the Three Gorges dam bedrock geology flaws and the dam body cracks and its treatment measures
    上一篇论文: 三峡大坝基岩地质缺陷及坝体裂缝处理措施研究;
    Beijing Admits Problems With Dam
    中国承认三峡大坝存在隐患;
    diverting dam
    引水坝;
    diversion dam
    分水坝; 引水坝; 分流坝;
    beaver dam
    河狸坝; 海狸水坝;

查词历史

Copyright @ 2005-2013 可可英语 京ICP备11028623号