1. Inclined haul-off capstans of2500 double haul-off unit ensure the stranded wire running straightly. 双主动牵引,倾斜的牵引,能保证绞合后的电缆直线运动。
2. Inclined haul-off capstans of 2500 double haul-off unit ensure the stranded wire running straightly. 2500双主动牵引,倾斜的牵引,能保证绞合后的电缆直线运动。
3. What are long haul and short haul shanties?Write about one example of each. 什么很长用力拖拉和短用力拖拉简陋房屋? 写有关每个的一个例子。
4. The highway, 414 miles (666 kilometers) of gravel known as the Haul Road, was built to haul construction crews to the Prudhoe Bay oil fields. 高速公路,414英里( 666公里)的砾石称为检获的道路,建立了检获的施工人员向普拉德霍湾油田。
5. A new combined model of longitudinal dynamic and air brake system for heavy haul train is established. 开发了基于空气制动系统仿真的列车纵向动力学仿真程序。